Got the tub and one arch fitted today along with the rear lights. Also bolted the mirrors onto the scuttle.
Monday, 27 September 2010
Sunday, 26 September 2010
The Saturn boys have paid a visit.
Andy and HAndy popped down on Saturday to drop off my rear tub & arches and to have a look at my build. I got the tub cut to shape and in place yesterday, but my plans of a full day on the roadster failed, as the exhaust on my everyday car decided to snap clean in half at one of the joints on the manifold!
Anyways, managed to catch up today, got the base map and all the sensors calibrated on the ecu, and started to fabricate the exhaust. :D
Waiting on a starter motor arriving in the post and need to sort a fuel tank soon!
Here's some piccies to keep you all happy...
Anyways, managed to catch up today, got the base map and all the sensors calibrated on the ecu, and started to fabricate the exhaust. :D
Waiting on a starter motor arriving in the post and need to sort a fuel tank soon!
Here's some piccies to keep you all happy...
Thursday, 23 September 2010
Small update...
Got most of the wiring in place, so made a start on the dash. Not much more to say really, as pics of wires aren't very interesting.
Saturday, 11 September 2010
One step closer.
Popped over to saturn this morning to collect my scuttle. Andy also sorted me out with a piece of aluminium to make the bulkhead panel. Managed to get that cut to shape this afternoon and made a start on the wiring.
I've got the wires running from the scuttle to the back of the car and from the scuttle to the front of the car all in place and clipped. Also fastened the relay and fuse holders to the bulkhead panel.
Sunday, 5 September 2010
2 Month anniversary.
Well, i got my donor parts delivered 2 months tomorow, and this is how it stands now...
Got the engine fitted today, the brakes are about finished, just waiting to get a couple of fittings. The seat's bolted in, rear transmision is all finished, suspension is all sorted.
Going to make a start on the wiring next.
Got the engine fitted today, the brakes are about finished, just waiting to get a couple of fittings. The seat's bolted in, rear transmision is all finished, suspension is all sorted.
Going to make a start on the wiring next.
Saturday, 4 September 2010
Pipework's about finished.
Wednesday, 1 September 2010
Whey! Got some wheels on at last!
Subscribe to:
Posts (Atom)